M1369/26
Checking status...
OpsUAS/Drone Operations

UAS operations south of PABI; manned aircraft should contact Allen ATC or Allen Operations for status.

2026-11-02 08:01 - 2026-11-08 07:59
Duration:SHORT6 days

Period of Applicability

2026-11-02 08:01 - 2026-11-08 07:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

UAS operations will take place 24 hours daily from 0001 local time on 2 November through 2359 local time on 8 November 2026, below 400 ft AGL, 1–3.5 NM south of PABI (Big) between the Richardson Highway and Jarvis Creek. Manned aircraft should contact Allen ATC on 119.800 or Allen Operations on 122.900 for UAS status.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1369/26 NOTAMN Q) ZAN/QXXXX/IV/NBO/A/000/999/6359N14543W005 A) PABI B) 2611020801 C) 2611080759 E) UAS OPERATING 24 HOURS DAILY AT LESS THAN 400FT AGL BEGINNING AT 0001L MONDAY MORNING 02 NOV 2026, UNTIL 2359L SUNDAY MIDNIGHT 08 NOV 2026. AREA OF OPERATION IS 1NM TO 3.5NM SOUTH OF PABI(BIG), BETWEEN THE RICHARDSON HIGHWAY AND JARVIS CREEK. ALL MANNED AIRCRAFT, CONTACT ALLEN ATC ON 119.800 OR ALLEN OPERATIONS ON 122.900 FOR UAS STATUS. 2024-WSA -00521.
Was this helpful?