11/024
Checking status...
ADRunway Operations

Runway 23 is covered by dry snow.

2026-11-05 17:43 - 2026-11-06 17:43
Duration:SHORT1 day

Period of Applicability

2026-11-05 17:43 - 2026-11-06 17:43

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 23 has a reported runway condition code of 3/3/3, with 100% coverage by 1/4 inch of dry snow, observed on November 5, 2026, at 17:43 UTC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0670/26 NOTAMN Q) PAZN/QMRXX////000/999/5153N17638W005 A) PADK B) 2611051743 C) 2611061743 E) RWY 23 FICON 3/3/3 100 PCT 1/4IN DRY SN OBS AT 2611051743.
Was this helpful?