M0898/26
Checking status...
ADRunway Operations

Runway 7/25 closes during active snow clearing when the tower and Base Ops are closed; low approaches over the closed runway are prohibited.

2026-11-02 20:58 - 2027-01-28 20:30
Duration:3 months

Period of Applicability

2026-11-02 20:58 - 2027-01-28 20:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

When the tower and Base Ops are closed, runway 7/25 is closed while personnel and equipment are actively clearing snow; low approaches over the closed runway are prohibited during clearing. Rotary-wing pilots should give way to snow-removal equipment elsewhere on the airfield. Runway conditions are not monitored when Base Ops and ATC are closed; pilots are advised to make a low approach and visually check conditions before landing when the runway is available.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0898/26 NOTAMN Q) ZAN/QFAXX/IV/NBO/A/000/999/6450N14736W005 A) PAFB B) 2611022058 C) 2701282030 E) AERODROME WHEN TOWER AND BASE OPS ARE CLOSED, RWY 7/25 CLSD WHEN PERSONNEL AND EQUIPMENT ARE ACTIVELY CLEARING SNOW FROM THE RUNWAY. THIS ALSO INCLUDES NO LOW APPROACHES OVER THE CLOSED RUNWAY DURING THE CLEARING PROCESS. ROTARY-WING PILOTS ARE ADVISED TO GIVE-WAY TO SNOW REMOVAL EQUIPMENT OPERATING ON OTHER AREAS OF THE AIRFIELD. RUNWAY CONDITIONS ARE NOT MONITORED WHEN BASE OPERATIONS AND ATC ARE CLOSED. RECOMMEND THAT PILOTS CONDUCT A LOW APPROACH AND DO A VISUAL CHECK PRIOR TO LANDING.
Was this helpful?