5/3693
EST
Checking status...
NavDeparture Procedures

ODP St George amended with updated RWY 29 takeoff minimums and RWY 11 obstacle notes.

2025-11-07 14:00 - 2027-11-13 14:00
Duration:VERY LONG25 months EST

Period of Applicability

2025-11-07 14:00 - 2027-11-13 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At St George, AK, the Takeoff Minimums and Obstacle Departure Procedures (Amendment 2) are updated: RWY 29 takeoff minimums are 600-2 3/4 or standard with a minimum climb of 296 ft/NM to 800; RWY 11 obstacle notes are added, effective 2511071400 to 2711131400 EST (estimated).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) PAZA/QPDCH/I/NBO/A/000/999/5634N16939W005
A) PAPB
B) 2511071400
C) 2711131400EST
E) PBV ST GEORGE, ST GEORGE, AK.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2...
TKOF MNM RWY 29: 600-2 3/4 OR STANDARD WITH MINIMUM CLIMB 296 FT/NM TO 800.
TAKEOFF OBSTACLE NOTES: NOTE: RWY 11: TERRAIN 183 FT FROM DER, 474 FT LEFT OF CENTERLINE, 138 FT MSL. TERRAIN 1.6 NM FROM DER, 601 FT LEFT OF CENTERLINE, 550 FT MSL. TERRAIN 1.6 NM FROM DER, 696 FT RIGHT OF CENTERLINE, 556 FT MSL. TERRAIN 1.8 NM FROM DER, 5 FT RIGHT OF CENTERLINE, 626 FT MSL. TERRAIN 1.8 NM FROM DER, 877 FT LEFT OF CENTERLINE, 673 FT MSL. TERRAIN 2.1 NM FROM DER, 4009 FT LEFT OF CENTERLINE, 700 FT MSL.
Was this helpful?