M0284/26
Checking status...
ADRunway Operations

Personnel and equipment may be present within the runway primary surface near the south-side construction area.

2026-09-24 19:40 - 2026-12-22 23:59
Duration:LONG3 months

Period of Applicability

2026-09-24 19:40 - 2026-12-22 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A construction area is located south of the runway adjacent to the water catchments; expect personnel and equipment within the primary surface during off-peak hours.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0284/26 NOTAMN Q) ZAK/QFAHW/IV/NBO/A/000/999/0923N16728E005 A) PKRO B) 2609241940 C) 2612222359 E) AERODROME CONST AREA SOUTH SIDE OF RWY ADJACENT WATER CATCHMENTS. EXPECT MEN AND EQUIPMENT IN PRI SFC DURING OFF PEAK HOURS.
Was this helpful?