Period of Applicability
2026-07-01 00:00 - 2026-07-31 11:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Heavy equipment exists above the transitional surface for runway 16L/34R within the bounded area specified, with a maximum of 5 units. WX MNM, instrument approach procedures, SID and STAR are unchanged.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?