Period of Applicability
2026-08-03 00:00 - 2026-09-30 11:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Up to five pieces of heavy equipment are present above the transitional surface for runway 16L/34R, 369–481 metres beyond the runway 16L threshold and 166–233 metres left of the runway centreline at Narita. Weather minima, instrument approach procedures, SIDs and STARs remain unchanged. Scheduled 03–06, 17–21, 24–28, 31–Sep 04, 07–11, 14–18, 24–25 and 28–30, from 0000 to 1100.