Period of Applicability
2026-07-01 15:00 - 2026-07-30 20:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Heavy equipment exists above the approach surface for runway 16R in Narita-shi, Chiba, in up to 3 locations. Instrument approach procedures, SID and STAR are unchanged. Except aircraft in AIC 051/19 item 3, and emergency aircraft with prior permission at least 1 hour before, the equipment affects the area scheduled 01-03, 06-10, 13-17, 21-24, 27-30 1500/2000.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?