Heavy equipment exists above approach surface for RWY 16L and above transitional surface for RWY 16L/34R.
2024-10-09 14:10 - 2024-11-29 20:20
Period of Applicability
2024-10-09 14:10 - 2024-11-29 20:20
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Heavy equipment is located above the approach surface for runway 16L and above the transitional surface for runways 16L/34R from October 9 to 11, 14 to 18, 21 to 25, 28 to 31 and November 1, 4 to 8, 11 to 15, 18 to 22, and 25 to 29, between 1410 and 2020 hours.
Message
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND ABV TRANSITIONAL SFC FOR RWY 16L/34R 1.PSN: BOUNDED BY FLW POINTS 354826.07N1402233.02E 354825.87N1402234.91E 354824.83N1402235.70E 3548...
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors