Period of Applicability
2026-06-30 15:10 - 2026-07-31 20:20
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Heavy equipment exists above the approach surface for runway 34L at Narita-shi in Chiba, within the bounded area shown, during the scheduled periods. Weather minimums, instrument approach procedures, SID and STAR remain unchanged. Aircraft in AIC 051/19 item 3 are excluded. Emergency aircraft may operate with prior permission at least 1 hour before.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?