Period of Applicability
2026-08-03 15:10 - 2026-09-29 20:20
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
One item of heavy equipment penetrates the approach surface for runway 34L, from 77.5 m before to 3 m beyond the threshold and 53 m to 113 m left of the runway centerline, within the specified boundary in Narita-shi, Chiba. Active during the listed date periods from 1510 to 2020. Weather minima, instrument approach procedures, SIDs, and STARs remain unchanged. Aircraft covered by AIC 051/19 item 3 are excepted, as are emergency aircraft with permission requested at least one hour in advance.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?