B2159/26
Checking status...
ADTaxiway Operations

Taxiway Y side-stripe marking between B9 and B14 is partly erased.

2026-08-22 14:00 - 2026-10-31 15:00
Duration:3 months

Period of Applicability

2026-08-22 14:00 - 2026-10-31 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The taxiway side-stripe marking on taxiway Y between B9 and B14 is partly erased due to construction.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2159/26 NOTAMN
Q)RJJJ/QMMAW/V/M/A/000/999/3426N13514E005
A)RJBB B)2608221400 C)2610311500
E)TWY-SIDE-STRIPE-MARKING FOR Y(BTN B9 AND B14) PARTLY ERASED DUE TO
CONST
Was this helpful?