C2918/26
Checking status...
ADTaxiway Operations

Taxiways A1 through A5, D3 through D6, and H4 are closed for construction except for aircraft with prior permission.

2026-11-04 16:20 - 2026-11-04 21:20
Duration:VERY SHORT5 hours

Period of Applicability

2026-11-04 16:20 - 2026-11-04 21:20

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiways A1 through A5, D3 through D6, and H4 are closed due to construction, except for aircraft with prior permission obtained at least one hour beforehand.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C2918/26 NOTAMN
Q)RJJJ/QMXLC/IV/M/A/000/999/4247N14142E005
A)RJCC B)2611041620 C)2611042120
E)TWY A1 THRU A5,D3 THRU D6,H4 CLSD DUE TO CONST
EXC ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
Was this helpful?