C2219/26
Checking status...
ADRunway Operations

Runway 01R/19L grooving is partly erased due to construction.

2026-08-27 22:30 - 2026-09-17 22:30
Duration:21 days

Period of Applicability

2026-08-27 22:30 - 2026-09-17 22:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 01R/19L grooving is partly erased due to construction over a 72 m section between 764 m and 836 m from the runway 19L threshold. The affected width is 17.2 m, extending from 8.8 m west of the runway centerline to 8.4 m east of it.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C2219/26 NOTAMN
Q)RJJJ/QMRAW/IV/NBO/A/000/999/4247N14142E005
A)RJCC B)2608272230 C)2609172230
E)GROOVING FOR RWY 01R/19L PARTLY ERASED DUE TO CONST
LEN:   72M (BTN 764M AND 836M FM RWY 19L THR)
WID: 17.2M (BTN 8.8M ON THE W SIDE OF RCL AND
8.4M ON THE E SIDE OF RCL)