G2666/26
Checking status...
ADTaxiway Operations

Specified sections of taxiways A and B and connecting taxiways are closed.

2026-11-02 13:30 - 2026-11-28 22:00
Duration:aggregated 9 days

Period of Applicability

2026-11-02 13:30 - 2026-11-28 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiways A at the B3 and B8 intersections, A3, A3S, A8, A8N, B3 and B8 are closed on days 02–07, 09–14, 16–21 and 23–28 from 1330 to 2200. Refer to AIP SUP 244/26, item TWY:D; the exact time of the next period will be notified by a further NOTAM.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G2666/26 NOTAMN
Q)RJJJ/QMXLC/IV/M/A/000/999/3451N13648E005
A)RJGG B)2611021330 C)2611282200
D)02-07 09-14 16-21 23-28 1330/2200
E)TWY A(INT OF B3),A(INT OF B8),A3,A3S,A8,A8N,B3,B8 CLSD
RMK: (1)REF AIP SUP 244/26 ITEM TWY:D
(2)THE EXACT TIME OF NEXT PERIOD WILL BE NOTIFIED BY FURTHER NOTAM
Was this helpful?