M1570/26
Checking status...
OBSCrane Operations

Crane penetrates the transitional surface.

2026-09-27 02:04 - 2026-12-17 23:59
Duration:3 months

Period of Applicability

2026-09-27 02:04 - 2026-12-17 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Aircrews should use caution for a crane at 40°41'58.40"N 141°22'33.61"E, with a maximum height of 87.6 feet that penetrates the transitional surface by 65 feet. The crane will be raised Monday through Friday from 0800 to 1700 local time until December 31, 2026.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1570/26 NOTAMN Q) RJJJ/QXXXX/IV/NBO/A/000/999/4042N14122E005 A) RJSM B) 2609270204 C) 2612172359 E) AIRCREW USE CATION: CRANE LOCATED AT E141º 22' 33.61 N40º 41' 58.40 WITH A MAX HEIGHT OF 87.6 FEET THAT WILL VIOLATE TRANSITIONAL SURFACE BY 65 FEET. CRANE WILL BE UP MONDAY THROUGH FRIDAY FROM 0800 TO 1700L UNTIL 31 DEC 26.
Was this helpful?