K2395/26
Checking status...
ADRunway Operations

Runway 09/27 grooving is partly erased due to construction.

2026-10-13 22:30 - 2026-11-27 22:30
Duration:2 months

Period of Applicability

2026-10-13 22:30 - 2026-11-27 22:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 09/27 grooving is partly erased due to construction over a 320 m section between 1,125 m and 1,445 m from the runway 09 threshold, across a 30 m width extending 15 m either side of the runway centreline.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

K2395/26 NOTAMN
Q)RJJJ/QMRAW/IV/NBO/A/000/999/3808N14055E005
A)RJSS B)2610132230 C)2611272230
E)GROOVING FOR RWY 09/27 PARTLY ERASED DUE TO CONST
LEN: 320M (BTN 1125M AND 1445M FM RWY 09 THR)
WID:  30M (WITHIN AND EXTENDING UP TO 15M BOTH SIDE OF RCL)
Was this helpful?