A1724/26
ADRunway Operations

Runway 01 RESA dimensions differ between the AIP and the Airport Operations Manual.

2026-11-20 08:17 - 2027-02-19 15:00
Duration:LONG4 months

Period of Applicability

2026-11-20 08:17 - 2027-02-19 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The published dimensions of the runway 01 runway end safety area (RESA) in the AIP differ from those in Muan International Airport's Airport Operations Manual due to runway construction. A revision of the manual is in progress.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1724/26 NOTAMN
Q)RKRR/QFAXX/IV/NBO/A/000/999/3459N12622E005
A)RKJB B)2611200817 C)2702191500
E)RWY 01 RESA DIMENSIONS PUBLISHED IN AIP DIFFER FROM THOSE IN MUAN
INTERNATIONAL AIRPORT AOM(AIRPORT OPERATIONS MANUAL) DUE TO RUNWAY
CONSTRUCTION. AOM (AIRPORT OPERATIONS MANUAL)REVISION IN PROGRESS.
Was this helpful?