V0462/26
Checking status...
NavDeparture Procedures

Gwangju 3N SID is not authorized from runway 01.

2026-10-01 18:38 - 2026-12-30 14:59
Duration:LONG3 months

Period of Applicability

2026-10-01 18:38 - 2026-12-30 14:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The Gwangju 3N standard instrument departure is not authorized from runway 01.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0462/26 NOTAMN
Q) RKRR/QPIAU/I/BO/A/000/999/3459N12622E005
A) RKJB
B) 2610011838
C) 2612301459
E) [US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED RWY 01 GWANGJU 3N DEPARTURE
Was this helpful?