M0663/26
Checking status...
OBSConstruction Activity

Men and equipment are operating south of Taxiway B within the primary surface.

2026-09-25 00:37 - 2026-12-23 23:59
Duration:LONG3 months

Period of Applicability

2026-09-25 00:37 - 2026-12-23 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Men and equipment are operating south of Taxiway B, outside 150 feet from the runway shoulder on both sides, within the primary surface.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0663/26 NOTAMN Q) RKRR/QFAHW/IV/NBO/A/000/999/3657N12701E005 A) RKSG B) 2609250037 C) 2612232359 E) AD OBST MEN AND EQUIP OPERATIONS S OF TWY B OUTSIDE 150 FT FM RWY SHOULDER BOTH SIDES IN PRIMARY SFC
Was this helpful?