B2459/26
PERM
Checking status...
OpsFlight Procedures

Helicopter departures in the Manila ATZ require clearance procedures, with special rules for RP-R75 areas.

2026-06-04 00:00 - PERM
Duration:PERMANENT

Period of Applicability

2026-06-04 00:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

All helicopters departing within the Manila ATZ, except those operating within the RP-R75 areas, shall obtain takeoff clearance and route clearance to their destination from Manila Control Tower prior to becoming airborne. Helicopters operating within the RP-R75 areas shall initially lift off from their designated helipads and establish communication with Manila Control Tower to obtain route clearance to their destination before proceeding with the flight. Ref AIP RPLL AD 2-50, item 3.1.2.4.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2459/26 NOTAMN
Q) RPHI/QFAXX/IV/NBO/A /000/999/1431N12101E005
A) RPLL B) 2606040000 C) PERM
E) ALL HEL DEPARTING WI THE MANILA ATZ, EXC THOSE OPR WI THE RP-R75
AREAS, SHALL OBTAIN TKOF CLR AND RTE CLR TO THEIR DEST FM MANILA CTL
TWR PRIOR TO AIRBORNE. HEL OPR WI THE RP-R75 AREAS SHALL INITIALLY
LIFT OFF FM THEIR DESIGNATED HELIPADS AND ESTABLISH COM WI MANILA
CTL TWR TO OBTAIN RTE CLR TO THEIR DEST BEFORE PCD WITH THE FLT.
REF AIP RPLL AD 2-50, ITEM 3.1.2.4.
Was this helpful?