B5061/24
Checking status...
Apron Operations

Aircraft assigned to park at main parking bay 2, 3, 4, and 5 must shut down engine 1.

2024-11-12 00:31 - 2025-02-10 23:59

Period of Applicability

2024-11-12 00:31 - 2025-02-10 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

All aircraft assigned to park at main parking bays 2, 3, 4, and 5 shall shut down engine 1 to ensure safe docking operations at aerobridge and bridge-mounted equipment prior to operations.

Message

ALL ACFT ASSIGN TO PARK AT MAIN PRKG BAY 2, 3, 4 AND 5 SHALL SHUTDOWN ENG 1 TO ENSURE SAFE DCKG OPS AT AEROBRIDGE AND BRIDGE MOUNTED EQPT PRIOR TO OPS.

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B5061/24 NOTAMR B3213/24
Q) RPHI/QMKXX/IV/BO /A /000/999/1018N12359E005
A) RPVM B) 2411120031 C) 2502102359
E) ALL ACFT ASSIGN TO PARK AT MAIN PRKG BAY 2, 3, 4 AND 5 SHALL 
SHUTDOWN ENG 1 TO ENSURE SAFE DCKG OPS AT AEROBRIDGE AND BRIDGE 
MOUNTED EQPT PRIOR TO OPS.