Aircraft at main parking bays 2, 3, 4, and 5 must shut down engine 1.
2024-08-14 00:00 - 2024-11-13 23:59
Period of Applicability
2024-08-14 00:00 - 2024-11-13 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
All aircraft assigned to park at main parking bays 2, 3, 4, and 5 are required to shut down engine 1 to ensure safe docking operations at the aerobridge and bridge-mounted equipment prior to operations.
Message
ALL ACFT ASSIGN TO PARK AT MAIN PRKG BAY 2, 3, 4 AND 5 SHALL SHUTDOWN ENG 1 TO ENSURE SAFE DCKG OPS AT AEROBRIDGE AND BRIDGE MOUNTED EQPT PRIOR TO OPS.
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors