I0319/26
Checking status...
ADRunway Operations

Runway 13/31 bearing strength has changed.

2026-04-29 17:45 - 9999-12-31 23:59
Duration:VERY LONG97078 months

Period of Applicability

2026-04-29 17:45 - 9999-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Bearing strength of runway 13/31 has changed to PCR 780/F/B/X/T. Reference: AIP AD 2.12, AIP AD 2.24 ADC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

I0319/26 NOTAMN
Q) SBRE/QMBCH/IV/BO/A/000/999/0347S03832W005
A) SBFZ
B) 2604291745 C) PERM
E) BEARING STRENGTH RWY 13/31 CHANGED TO PCR 780/F/B/X/T
REF: AIP AD 2.12, AIP AD 2.24 ADC
Was this helpful?