C4440/26
Checking status...
ADRunway Operations

Trench construction is in progress along the RWY 09/28 strip; use caution.

2026-10-08 20:40 - 2026-12-31 23:59
Duration:3 months

Period of Applicability

2026-10-08 20:40 - 2026-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A trench 3 m wide and 3 m deep is under construction along the RWY 09/28 strip, located 60 m south of the runway edge; use caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C4440/26 NOTAMR C3928/26
Q)SCTZ/QMWHW/IV/M/A/000/999/4555S07141W005
A)SCBA B)2610082040 C)2612312359
E)STP RWY 09/28 CONST ZANJA 3M WID POR 3M DPT A LO LARGO DE RWY, LCA
AT
60M AL S BORDE DE RWY 09/28, CTN