A2375/26
Checking status...
ADRunway Operations

Runway 07/25 is closed except at the runway 12/30 intersection, with its first third available for taxiing.

2026-08-28 12:30 - 2026-08-28 16:00
Duration:VERY SHORT4 hours

Period of Applicability

2026-08-28 12:30 - 2026-08-28 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 07/25 is closed, excluding its intersection with runway 12/30. The first third of runway 07/25 is available for taxiing. Follow Punta Arenas Tower instructions on 118.7 MHz and Ground Control instructions on 121.9 MHz.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2375/26 NOTAMN
Q)SCCZ/QMRLC/IV/NBO/A/000/999/5300S07051W005
A)SCCI B)2608281230 C)2608281600
E)RWY 07/25 CLSD, NOT INCLUDED INT RWY 12/30. RWY FIRST THIRD AVBL
FOR TAXIING.
INSTRUCTIONS: PUNTA ARENAS TWR 118.7MHZ
PUNTA ARENAS GNDC 121.9MHZ
Was this helpful?