A1731/26
PERM
Checking status...
ADApron Operations

Apron pavement strength changed; AIP Bolivia entry corrected.

2026-11-04 23:30 - PERM
Duration:PERMANENT

Period of Applicability

2026-11-04 23:30 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The apron pavement strength is changed to PCR 580/F/C/X/T. This corrects the apron entry in AIP Bolivia, SLGM AD 2.8.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1731/26 NOTAMN
Q) SLLF/QMNCH/IV/NBO/A/000/999/1053S06522W005
A) SLGM B) 2611042330 C) PERM
E) APN CHANGED NXT INFO:
STRENGTH: PCR 580/F/C/X/T
RMK: CORRECT AIP BOLIVIA
PAG AD 2 SLGM 3 SUBSECCION SLGM AD 2.8 AFFAIR 1
Was this helpful?