A1740/26
PERM
Checking status...
ADApron Operations

Main apron pavement strength changed.

2026-11-05 17:37 - PERM
Duration:PERMANENT

Period of Applicability

2026-11-05 17:37 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The main apron pavement strength is changed to PCR 1100/R/C/W/T; correct AIP Bolivia page AD 2 SLVR 3, subsection SLVR AD 2.8, AFFAIR 1.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1740/26 NOTAMN
Q) SLLF/QMNCH/IV/NBO/A/000/999/1738S06308W005
A) SLVR B) 2611051737 C) PERM
E) MAIN APN CHANGED  NXT INFO:
RESISTENCIA: PCR 1100/R/C/W/T
RMK: CORREGIR AIP BOLIVIA
PAG AD 2 SLVR 3 SUBSECTION SLVR AD 2.8 AFFAIR 1
Was this helpful?