C2175/25
EST
Checking status...
OpsFlight Procedures

SPJR–SPJC flight plans must specify VATES T329 KOMGO; ATC may assign direct routing or vectors.

2025-06-11 15:40 - 2025-09-11 17:00
Duration:LONG4 months EST

Period of Applicability

2025-06-11 15:40 - 2025-09-11 17:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

All SPJR–SPJC flight plans must specify the route VATES T329 KOMGO. ATC will assign upper flight levels in UTA Lima according to the flight level requested in the flight plan and may use direct routing or vectors if required.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C2175/25 NOTAMR C0948/25
Q) SPIM/QPLCS/I /BO /A /000/999/0708S07829W005
A) SPJR B) 2506111540 C) 2509111700 EST
E) TODO FPL SPJR-SPJC CONSIGNAR RTE VATES T329 KOMGO. ATC ASIGNARA FL
SUPERIORES UTA-LIMA CONFORME FL SOLICITADO EN FPL. ATC APLICARA DCT
O VECTORIZACION DE SER REQUERIDO
Was this helpful?