C0169/24
Checking status...
Lighting Systems

Switch over time to secondary power supply up to 15 seconds.

2024-11-20 10:28 - 2025-02-20 23:59

Period of Applicability

2024-11-20 10:28 - 2025-02-20 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The switch over time to the secondary power supply will be up to 15 seconds.

Message

SWITCH OVER TIME TO SECONDARY POWER SUPPLY TILL 15 SECONDS REF AIP UATT AD 2.15.4.

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C0169/24 NOTAMN
Q) UATT/QLRXX/IV/NBO/A /000/999/5015N05712E005
A) UATT B) 2411201028 C) 2502202359
E) SWITCH OVER TIME TO SECONDARY POWER SUPPLY  TILL 15 SECONDS
REF AIP UATT AD 2.15.4.