G0341/25
PERM
Checking status...
NavNavigation Aid Status

GLS procedure for runway 26 is not available.

2025-07-09 00:40 - PERM
Duration:PERMANENT

Period of Applicability

2025-07-09 00:40 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The GLS procedure for runway 26 is not available as per the referenced AIP Russia documentation.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) UEEE/QGWAU/I/NBO/EA/000/999/5654N12454E150
A) UELL B) 2507090040 C) PERM
E) GBAS CH 20938: GLS RWY 26 PROC NOT AVBL.
REF AIP RUSSIA BOOK 2 PAGE AD 2.2 UELL-7 (TABLE AD 2.19), UELL-156.
Was this helpful?