RWY 07/25 is temporarily limited due to construction, with the RWY 25 clearway and stopway unavailable.

2026-09-26 18:00 - 2026-09-27 12:00
Duration:VERY SHORT18 hours

Period of Applicability

2026-09-26 18:00 - 2026-09-27 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Due to construction work in progress 150 m west of the RWY 07 threshold, temporary runway limitations apply: RWY 25 RESA is available at 90 m by 150 m; RWY 07/25 strip is available at 2,680 m by 300 m; RWY 25 clearway and stopway are temporarily unavailable; and RWY 25 TODA and ASDA are each limited to 2,500 m.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0596/26 NOTAMN
Q) UGGG/QMRLT/IV/NBO/A /000/999/4211N04229E005
A) UGKO B) 2609261800 C) 2609271200
E) FLW TEMPO LIMITATIONS APPLY DUE TO CONST WIP 150M WEST OF RWY 07
THR:
RWY 25 RESA 90MX150M AVBL.
RWY 07/25 STRIP 2680MX300M AVBL.
RWY 25 CWY TEMPO NOT AVBL.
RWY 25 STOPWAY TEMPO NOT AVBL.
RWY 25 TODA 2500M AVBL.
RWY 25 ASDA 2500M AVBL.