G0477/26
Checking status...
ADRunway Operations

Temporary RWY 07/25 limitations apply due to construction, with the RWY 25 clearway and stopway unavailable.

2026-08-01 18:05 - 2026-09-23 11:00
Duration:2 months

Period of Applicability

2026-08-01 18:05 - 2026-09-23 11:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Temporary limitations apply due to construction work in progress 150 m west of the RWY 07 threshold. For RWY 25, a 90 m by 150 m runway end safety area (RESA) is available, while the clearway (CWY) and stopway are temporarily unavailable; the available take-off distance (TODA) and accelerate-stop distance (ASDA) are each 2,500 m. The available RWY 07/25 strip measures 2,680 m by 300 m.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0477/26 NOTAMN
Q) UGGG/QMRLT/IV/NBO/A /000/999/4211N04229E005
A) UGKO B) 2608011805 C) 2609231100
E) FLW TEMPO LIMITATIONS APPLY DUE TO CONST WIP 150M WEST OF RWY 07
THR:
RWY 25 RESA 90MX150M AVBL.
RWY 07/25 STRIP 2680MX300M AVBL.
RWY 25 CWY TEMPO NOT AVBL.
RWY 25 STOPWAY TEMPO NOT AVBL.
RWY 25 TODA 2500M AVBL.
RWY 25 ASDA 2500M AVBL.
Was this helpful?