A6671/26
Checking status...
ADAirport Operations

Arrivals of aircraft with MTOM of 2 tonnes or less require coordination with the aerodrome operator.

2026-09-24 07:00 - 2026-12-24 06:00
Duration:LONG4 months

Period of Applicability

2026-09-24 07:00 - 2026-12-24 06:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Arrival of aircraft with a maximum take-off mass of 2 tonnes or less is permitted only with prior coordination with the aerodrome operator.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A6671/26 NOTAMN
Q)UHHH/QFALT/IV/NBO/A/000/999/4324N13209E005
A)UHWW B)2609240700 C)2612240600
E)ARR OF ACFT WITH MTOM 2 TONS AND LESS CARRIED OUT BY COORDINATION
WITH AD OPERATOR.
Was this helpful?