Period of Applicability
2026-08-20 00:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Aerodrome charges are established as follows: takeoff and landing, USD 15 per metric tonne of maximum takeoff mass; aircraft parking, 15 percent of the takeoff and landing charge per 24 hours; transport security, USD 10 per metric tonne of maximum takeoff mass; and terminal building use, USD 8 per passenger. Reference AIP Russia page GEN 4.1-10.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?