Reconstruction of part of apron, TWY C, and TWY M requires towing for certain aircraft and helicopter operations.
2024-12-28 11:00 - 2025-12-31 23:59
Period of Applicability
2024-12-28 11:00 - 2025-12-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Due to reconstruction of part of apron, TWY C, and TWY M, aircraft and MI-8 and lower class helicopters taxiing onto/out of stands 6-12, 14, 16 shall be performed by towing. Engine start-up and shutdown shall be performed at start-up point only.
Message
DUE RECONSTRUCTION OF PART OF APRON, TWY C, TWY M: ACFT AND MI-8 AND LOWER CLASS HEL TAXIING ONTO/OUT OF STANDS 6-12, 14, 16 SHALL BE PERFORMED BY TOWING. ENG START-UP AND SHUTDOWN SHALL BE PERFORMED ...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2024-12-28 11:33
Was this helpful?