A4494/26
PERM
Checking status...
ADMPublication Updates

AIP publication update amends the TWY-F width, surface and strength data.

2026-07-14 04:18 - PERM
Duration:PERMANENT

Period of Applicability

2026-07-14 04:18 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

AIP page AD 2.1 USRR-3, section AD 2.8, line TWY-F is amended to read 22 m from RWY 07/25 to TWY H, strengthened shoulders 8.5 m on both sides, reinforced concrete (PAG-14) strengthened by asphalt-concrete, PCN 72/R/B/X/T (mixed) instead of published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4494/26 NOTAMR A7837/25
Q)USTV/QMXXX/IV/M/A/000/999/6121N07324E005
A)USRR B)2607140418 C)PERM
E)REF AIP PAGE AD 2.1 USRR-3, 39 SECTION AD 2.8 APRONS,TWY AND CHECK
LOCATIONS/POSITIONS DATA ITEM 2.8.2 WIDTH,SURFACE AND STRENGTH
LINE TWY-F TO READ:
22M(FM RWY 07/25 TO TWY H) STRENGTHENED SHOULDERS 8.5 ON BOTH SIDES
REINFORCED CONCRETE (PAG-14)STRENGTHENED BY ASPHALT-CONCRETE,
PCN 72/R/B/X/T (MIXED) INSTEAD OF PUBLISHED
Was this helpful?