O0330/24
Checking status...
Communication Requirements

Aircraft crews entering Turkmenistan airspace from Afghanistan and Iran must establish communication with Turkmenistan ATC units.

2024-08-08 10:00 - PERM

Period of Applicability

2024-08-08 10:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Aircraft crews entering Turkmenistan airspace from the airspace of Afghanistan and Iran are required to make contact with Turkmenistan ATC units 150-200 km before crossing the FIR boundary.

Message

ACFT CREWS ENTERING TURKMENISTAN AIRSPACE FROM AIRSPACE OF AFGANISTAN AND IRAN SHALL ESTABLISH COMMUNICATION WITH TURKMENISTAN ATC UNITS AT 150-200KM BEFORE CROSSING FIR BOUNDARY. ACFT CREWS ENTERING ...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

O0330/24 NOTAMR O0329/24
Q) UTXX/QOECH/IV/NBO/E/000/999/3800N05600E500
A) UTAA UTAV UTAK UTAT B) 2408081000 C) PERM
E) ACFT CREWS ENTERING TURKMENISTAN AIRSPACE FROM AIRSPACE OF
AFGANISTAN AND IRAN SHALL ESTABLISH COMMUNICATION WITH TURKMENISTAN
ATC UNITS AT 150-200KM BEFORE CROSSING FIR BOUNDARY.
ACFT CREWS ENTERING TURKMENISTAN AIRSPACE FROM AIRSPACE OF
AZERBAIJAN, KAZAKHSTAN AND UZBEKISTAN DO NOT NEED TO ESTABLISH
COMMUNICATION WITH TURKMENISTAN ATC UNITS BEFORE CROSSING FIR
BOUNDARY UNLESS OTHERWISE INSTRUCTED BY ATC UNITS.
REF AIP TURKMENISTAN GEN 1.2-2.