Period of Applicability
2024-09-04 07:00 - 2024-12-04 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
At a distance of 270 meters from the axis of runway 11/29 between the apron and taxiway M, there is an installation of stormwater drainage involving construction equipment with a crane boom outreach of up to 25 meters.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?