A5188/26
Checking status...
ADTaxiway Operations

Marked equipment is operating at the taxiway A and runway 06 junction and will be cleared from the taxiway during takeoffs and landings.

2026-08-08 03:00 - 2026-08-31 17:00
Duration:24 days

Period of Applicability

2026-08-08 03:00 - 2026-08-31 17:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Equipment 4 to 10 m high is operating over a distance of 40 m at the junction of taxiway A and runway 06. The equipment will be cleared from the taxiway during takeoff and landing operations, and day and night obstacle markings are provided.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5188/26 NOTAMN
Q)UWWW/QFAHW/IV/NBO/A/000/999/5605N04721E005
A)UWKS B)2608080300 C)2608311700
E)1. AT TWY A AND RWY 06 JUNCTION OVER DIST OF 40M EQUIPMENT (FM 4 TO
10M HIGH) OPR.
2. EQUIPMENT CLEARED OF TWY DRN TKOF AND LDG OPR.
3. DAY AND NIGHT OBST MARKINGS PROVIDED.