Period of Applicability
2026-06-25 05:00 - 2026-09-23 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Stand 11A (asphalt, concrete PCN 65/F/D/W/T) is put into operation on the apron between stands 11 and 27 for aircraft with wingspan not exceeding 38 m and length not exceeding 47.9 m.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?