A1530/26
Checking status...
ADTaxiway Operations

Taxiway M and part of Taxiway K are closed, with work near Taxiways P and L5 and an alternate isolated parking position on Taxiway P.

2026-10-01 14:00 - 2026-11-26 23:59
Duration:2 months

Period of Applicability

2026-10-01 14:00 - 2026-11-26 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress in multiple areas: Taxiway M and the portion of Taxiway K from the runway edge to Taxiway M are closed; an alternate isolated aircraft parking position is available on Taxiway P between Taxiways D and R4; drainage work is taking place north of Taxiway P, more than 35 m from its centreline between Taxiways B and R4, with personnel and movable equipment up to 3 m high to be moved beyond 43.5 m during Code E operations; and work is in progress 15 m from Taxiway L5. Pilots must exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1530/26 NOTAMN
Q) VABF/QMXHW/IV/NBO/A/000/999/2304N07238E005
A) VAAH B) 2610011400 C) 2611262359
E) WIP IN FLW AREAS:
1) TAXIWAY M AND A PORTION OF TAXIWAY K FM THE
RUNWAY EDGE TO TAXIWAY M ARE CLOSED.
2) AN ALTERNATE ISOLATED ACFT PARKING POSITION
IS PROVIDED ON TAXIWAY P BTN TAXIWAYS D AND R4
(SEE EAIP INDIA VAAH AD 2.8.6.5).
3) DRAINAGE WORK NORTH OF TAXIWAY P, BEYOND 35M
FM TAXIWAY P CENTRELINE BTN TAXIWAYS B AND R4,
PERSONNEL AND MOVABLE EQUIPMENT UP TO 3M HGT
WILL BE SHIFTED BEYOND 43.5M, DRG CODE E OPERATIONS.
4) WIP 15M FM TAXIWAY L5.
PILOTS SHALL EXER CTN.