A0973/26
Checking status...
ADRunway Operations

GPR survey work is taking place beyond 70 m from the runway centreline.

2026-07-03 12:00 - 2026-08-04 12:00
Duration:2 months

Period of Applicability

2026-07-03 12:00 - 2026-08-04 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Ground penetrating radar survey work is taking place on either side of the runway beyond 70 m from the runway centreline, with movable equipment and machinery limited to 3.5 m AGL. Pilots are to exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0973/26 NOTAMN
Q) VABF/QFAHW/IV/NBO/A/000/999/2304N07238E005
A) VAAH B) 2607031200 C) 2608041200
E) GND PENETRETING RADAR(GPR) SURVEY WIP ON EITHER
SIDE OF RWY BEYOND 70M FM RCL. MAX HGT OF
MOVABLE EQPT/MACHINERY LIMITED TO 3.5M AGL.
PILOTS TO EXER CTN
Was this helpful?