Period of Applicability
2026-07-01 13:00 - 2026-09-30 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Taxiway M and a portion of taxiway K from the runway edge to taxiway M are closed due to work in progress. An alternate isolated aircraft parking position is provided on taxiway P between taxiway D and taxiway R4. Drain work is in progress north of taxiway P, beyond 35 m from the taxiway P centreline, between taxiway B and taxiway R4, with personnel and movable machinery up to 3 m high shifted beyond 43.5 m during code E operations. Work is also in progress 15 m from taxiway L5; pilots are to exercise caution.