A1152/26
Checking status...
ADRunway Operations

Exercise caution during landing and takeoff due to cable work and personnel on the south side of the Runway 27 strip.

2026-08-05 04:30 - 2026-08-06 12:30
Duration:VERY SHORTaggregated 16 hours

Period of Applicability

2026-08-05 04:30 - 2026-08-06 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Personnel are deployed for cable rectification work within the south side of the Runway 27 strip, from the beginning of Runway 27 to Taxiway E1 and between 75 and 85 metres south of the Runway 27 centreline. Pilots should exercise caution during landing and takeoff. Work is scheduled from 0430 to 1230.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1152/26 NOTAMN
Q) VABF/QFAHW/IV/NBO/A/000/999/1906N07252E005
A) VABB B) 2608050430 C) 2608061230
D) 0430-1230
E) MANPOWER DEPLOYED ON WATCH ON WARD BASIS FOR CABLE
RECTIFICATION WORK WI RWY27 STRIP SOUTH SIDE.
WORK AREA LCA FM BEGINNING RWY27 UPTO TWY E1 AND
BTN 75M TO 85M SOUTH OF RCL 27.
PILOTS TO EXER CTN DRG LDG AND TKOF
Was this helpful?