C0736/12
Checking status...
Airport maintenance

CAT-I ALS available for runway 26.

2012-07-28 00:00 - PERM

Period of Applicability

2012-07-28 00:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The CAT-I Approach Lighting System (ALS) for runway 26 is available with a total length of 900 meters.

Message

CAT-I ALS RWY26 AVBL WITH FLW DETAILS: 1.TOTAL LEN:900M 2.STAND

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C0736/12 NOTAMN
Q) VABF/QLAXX/IV/NBO/A /000/999/2437N07354E005
A) VAUD B) 1207280000 C) PERM
E) CAT-I ALS RWY26 AVBL WITH FLW DETAILS:
   1.TOTAL LEN:900M
   2.STAND BY SUPPLY STS:AVBL WITH SWITCHOVER TIME 12 SEC
   3. SPECIFICATION OF LGT:-
   A) UNIDIRECTIONAL ELEVATED HIGH INTST HALOGEN TYPE RWY APCH
      LGT FITTINGS COMPLETE WITH PREFOCUS LAMP HOLDER 150 WATT,
      6.6 AMPERE.HALOGEN LAMP:103NR.
   B) INSET TYPE UNIDIRECTIONAL APCH LGT FITTINGS WITH
      3X100W/105W/6.6A.HALOGEN LAMP:17NR