A0082/23
Checking status...
Publication Updates

Change in effective date for AIRAC AIP SUP A9/23.

2023-10-16 00:01 - PERM

Interpretation

The effective date for AIRAC AIP SUP A9/23 has been changed to 16 October 2023. All other referenced AIRAC AIP SUPs maintain their effective date of 05 October 2023 at 0001 UTC.

Message

REF AIRAC AIP SUP A5-A6-A7-A8/23 DATED 10 AUG 2023 THE EFFECTIVE DATE WILL REMAIN FM 05 OCT 2023 AT 0001 UTC EXCEPT AIRAC AIP SUP A9/23 DATED 10 AUG 2023 EFFECTIVE DATE WILL BE CHANGED TO 16 OC...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0082/23 NOTAMR A0079/23
Q) VDPF/QFAAO///A/000/999/
A) VDSA  B) 2310160001 C) PERM 
E) REF AIRAC AIP SUP A5-A6-A7-A8/23 DATED 10 AUG 2023
  THE EFFECTIVE DATE WILL REMAIN FM 05 OCT 2023 AT 0001 UTC
  EXCEPT AIRAC AIP SUP A9/23 DATED 10 AUG 2023 EFFECTIVE DATE 
  WILL BE CHANGED TO 16 OCT 2023 AT 0001 UTC
RMK:-SIEM REAP INTERNATIONAL AIRPORT (VDSR) STILL OPEN UNTIL 15 OCT 2023
    AT 2000 UTC
   -ALL AIRCRAFT INTENDING TO LAND AND DEPART FM VDSR WILL BE
    PROVIDED WITH RADAR VECTOR SERVICE BY ATC FOR ROUTING TO STANDARD
    INSTRUMENT ARRIVAL (STAR) AND INSTRUMENT APPROACH PROCEDURE (IAP) AND
    FOR CONNECTING FM STANDARD INSTRUMENT DEPARTURE (SID) TO THE NEXT FLIGHT 
    PLANNED ROUTE.