A0110/26
Checking status...
ADRunway Operations

Soil replacement and turf replanting are in progress on a portion of the runway 03/21 strip without affecting scheduled flight operations.

2026-07-22 07:00 - 2026-09-25 22:00
Duration:3 months

Period of Applicability

2026-07-22 07:00 - 2026-09-25 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on a portion of the runway 03/21 strip for soil replacement and turf replanting. The work will take place between flights, and scheduled flight operations will continue as normal.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0110/26 NOTAMN
Q) VDPF/QMWHW/IV/M  /A /000/999/1034N10338E005
A) VDSV B) 2607220700 C) 2609252200
E) WIP RWY 03/21 SOIL REPLACEMENT AND TURF REPLANTING ON PORTION OF
RWY STRIP
-THESE WORKS WILL TAKE PLACE BTN FLT AND THE SKED FLT OPR AS NML
Was this helpful?