A1923/26
Checking status...
OBSCrane Operations

Two temporary construction cranes are operating west of runway 36, and permitted VFR operations must exercise caution.

2026-09-17 16:30 - 2026-12-15 00:30
Duration:aggregated 1 month

Period of Applicability

2026-09-17 16:30 - 2026-12-15 00:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Two temporary cranes are operating for construction of the new civil terminal building, reaching 279 ft and located 325 m west of the runway centerline abeam the runway 36 dumbbell. Permitted VFR operations must exercise caution. The schedule is 1630–2359 and 0000–0030.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1923/26 NOTAMN
Q) VECF/QOBCE/IV/M  /A /000/999/2641N08820E005
A) VEBD B) 2609171630 C) 2612150030
D) 1630-2359 0000-0030
E) OBST DUE 02 TEMPO CRANE OPS FOR CONST OF NEW CIV TERMINAL BLDG.
HGT
279FT. LCA 325M FM RCL ABM RWY 36 DUMBELL ON WESTERN SIDE. ALL
PERMITTED VFR OPS TO EXER CTN.)