Period of Applicability
2026-10-10 00:00 - 2027-01-07 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Kolkata Ground is conducting opportunity-based trial operations of SMC(S) on 121.900 MHz and SMC(N) on 121.725 MHz. Unless the tower specifies otherwise, arriving aircraft landing on runways 19L/19R should contact Ground on 121.900 MHz after vacating the runway; those landing on runways 01R/01L should use 121.725 MHz. When released by Clearance Delivery, departing aircraft from aprons 2 and 3 should contact Ground on 121.900 MHz, and those from aprons 1 and 4 should use 121.725 MHz.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?